Looking for a specific product?

Make a search for products & suppliers, articles & news.

Shore based energy to offshore gas field

Energy producer Total has been granted a lisence to install the world's longest cable for alternating current to the Norwegian gas field Martin Linge.

The 170 kilometre long sub-sea cable will ensure that the field will be powered by electricity generated on shore, when the development of the field is completed.

Martin Linge will be the seventh field on the Norwegian Shelf which receives all its energy from shore-based power grids.

Associated companies:


Related news

Latest news

The Foundation Det Norske Veritas assumes full ownership of DNV GL and remains committed to Maritime headquarters in Hamburg

The merger between DNV and GL has created significant value,

Servogear has achieved the ISO 14001: 2015 environmental certificate

The certificate provides a framework that an organization can follow,

TechnipFMC opens 18,000m² facility to support Middle East market

The opening of the 18,000 m2 facility,

INDUSTRY 4.0 WILL CHANGE ISS

The 2017 Beerenberg seminar held earlier this year addressed the fourth industrial revolution.

The upside down advocate

The hulls of the robust Polarcirkel boats consists of resistant PE plastic,

DNV GL presents GTT and TECHNOLOG with GASA statement for exoskeleton LNG tanks

The solution has been developed for VLCVs with a capacity of 14,000 to 18,000 

DNV GL: Mix of flexibility solutions needed to stabilize power grids and avoid outages

In its recently published Energy Transition Outlook report (ETO),

Marintec China: DNV GL awards DSIC a pair of AiP certificates

Lu Xiao Hui, Vice President and Chief Technical Officer of DSIC,

DNV GL partners with SP Energy Networks to develop local flexibility market and reduce carbon emissions by over 3 megatonnes

The flexibility market will be based on the Universal Smart Energy Framework (USEF),