Looking for a specific product?

Make a search for products & suppliers, articles & news.

Parat Halvorsen has been awarded with a new boiler plant contract with Kleven Maritime

The ship will be built at Kleven Verft AS, NB 357, and is of Marine Teknikk design MT 6015 which is a combined Plattform Supply- and Sub Sea construction vessel. The ship will be delivered to owner Myklebusthaug Management in February 2013.

 

The Parat boiler plant consists of an electric 1250kW boiler including heat recovery exchangers for various water consumers and a complete system, including steam injection lances for ORO/OSR mobilization, which is a necessary key part to meet and satisfy NOFO’s demands and regulations.

 

The most challenging within our scope of delivery is that the boiler shall be powered on direct current voltage and not alternating current that has been the standard solution. Many leaders within the industry argue that DC power distribution on board a ship will eliminate the problem with reactive power, and save energy as the generator engines not are dependent on running at a fixed speed regardless of power outlet. This new technology is expected to lead to a reduction in fuel consumption between 10-20%, depending on operational profile.

 

Read more about the first DC Power Grid on board a Kleven built ship here

 

Ship Details:

Length overall  93,80m

Length between p.p. 86,75m

Breadth moulded 20,00m

Dept. main deck midship 8,00m

Max. draft midship (SWL), approx. 6,50m

Depth shelter deck 10,85m

Associated companies:


Related news

Latest news

New emission rules 2020 - the reliable way to prove compliance

Reducing ship emissions is a top priority for IMO

United Technologies Opens State-of-the-Art Innovation Center, Announces Plan to Create 100 Additional Jobs

Employees working in the building today-

US Army Corps’ first F-10000 Davit

With space onboard Yaquina for davit operations limited, 

Chairman of IACS pinpoints three key themes of the Association’s strategy for the future

Commenting on the publication of the 2017 Annual Review, 

DNV GL launches alternative fuels white paper

For newbuilding vessels,

MINSHIP Shipmanagement boosts digitalization with DNV GL

MINSHIP is optimizing processes as they are managing a growing fleet. 

The fully electric Future of The Fjords has been launched

The new build is 42m long, 

Winner of Norwegian Export Award 2018 Announced

Airthings is the winner of the Norwegian Export Award 2018. 

Why going in circles is good

In fire detection systems for explosive environments,