PARAT Halvorsen AS to deliver two new oil-fired boiler plants to Simek Shipyard, Norway - Norway Exports

Looking for a specific product?

Make a search for products & suppliers, articles & news.

PARAT Halvorsen AS to deliver two new oil-fired boiler plants to Simek Shipyard, Norway

Parat Halvorsen AS has been awarded in all two oil fired boiler plant contracts with Simek Shipyard for their new buildings 129 and 130, with further one in option.

The boilers will be delivered as combined boilers for  both hot water production and steam production. The boiler plants will be equipped with a complete steam injection system for ORO tank heating. The oil fired boiler is of three-pass design, which less space demanding than a standard boiler design and with additional high steam production capacity.

The buildings, designed by Skipsteknisk AS are of ST-216 design with a length of approx. 85 meter, width of 19,2 meter and will be furnished for approx 20-25 crew members. Both buildings, contracted by Gulf Offshore will be delivered the middle and the end of 2013.

The ST-216 is designed with low resistance hull and high efficiency propellers in order to achieve low fuel oil consumption.

 

http://parat.no/default.asp?vis=nyhet&id=10591

 

 

For an interview, please contact Mr. Reidar Frisell on +47 99 48 55 27 or ref@parat.no

More info about the boiler can be found here: http://parat.no/default.asp?vis=artikkel&fid=7245&id=0406200908272328175&magasin=ja

Related news

Latest news

Servogear propulsion technology enable sustainable Arctic cruises

We are really happy to have Servogear on board,

Students develop "health check" to prevent cyberattacks

It is very rewarding working with cyber security,

DOF Subsea contract awards

DOF Subsea has been awarded a contract in the Atlantic region...

Invitation to Elkem’s second quarter and half year 2018 results presentation

The company will host a presentation at 8.00 a.m. 

DNV GL checks technical and financial risks of three Norwegian wind farms totaling 294 MW

Working alongside Norwegian developer Norsk Vind...

Sperre AS on National Geographic

Last autumn, National Geographic was on Lake Tinn in Norway...

DNV GL secures Shell Penguins contract

The Penguins field is in 165 metres (541 feet) of water,

DNV GL helps Borealis to realise ambitious energy targets by cutting over 360,000 tons of CO2 annually

Over the course of four years, 

Kickstart your autumn with «The AKVAculture Day”

The event, which takes place in BI’s facilities at Marineholmen in Bergen,