Looking for a specific product?

Make a search for products & suppliers, articles & news.

PALFINGER MARINE delivers two offshore cranes for innovative STREICHER VDD 400.2

PALFINGER MARINE delivers two offshore cranes for innovative STREICHER VDD 400.2 – TOPAZ modular drilling rig operated by Archer in Norwegian North Sea on Statoil Heimdal platform
 

  • Unique STREICHER modular drilling rig will be installed in the Norwegian North Sea 
  • German company STREICHER will build modular drilling rig in line with all relevant offshore regulations, including NORSOK

PALFINGER MARINE will deliver one knuckle boom crane and one pipe handling crane for this highly innovative project

Archer, the global oilfield service provider, has secured a contract with Statoil for the permanent plugging and abandonment of 12 gas wells on the Heimdal field in the Norwegian North Sea. Archer has selected the German rig manufacturer MAX STREICHER GmbH & Co. KG aA for its VDD 400.2 -TOPAZ modular drilling rig to decommission and seal existing bore holes. The VDD 400.2 has been developed in accordance with the NORSOK Norwegian safety standards. The whole rig consists of modules that do not exceed 12 tonnes and is cost effective due to quick erection and dismantling of the rig using the drilling platform’s own cranes.

Knuckle boom and pipe handling crane meet highest demands for offshore applications

PALFINGER MARINE will support this innovative drilling solution with two offshore cranes: the PK 23500 M knuckle boom crane and the PKM 700 T pipe handling crane. Both cranes have been developed and finally designed according to the specific requirements and standards by the engineering departments of PALFINGER MARINE and STREICHER. The cranes are assembled in Maribor, Slovenia, and will be delivered by the first quarter of 2014. The PK 23500 M is equipped with an automatically levelled access basket for safest man-riding applications. The crane can also be used with a hook or winch. For safety reasons, various movement sequences of the PKM 700 T will partially be automated, and an anti-collision system from STREICHER is integrated. The PKM 700 T will have higher capacity compared to the existing crane on STREICHER’s VDD 400.1 offshore rig, which is being used by Archer off the coast of New Zealand on Shell’s Maui A platform, besides having a radius of 21 metres. Both cranes meet the highest demands, including ATEX regulations and all offshore standards. “We are very proud to be a part of this innovative and seminal project. This will bring our offshore business to the next level and will help us gain even more ground in the oil and gas sector. Participating in such projects shows PALFINGER MARINE’s leadership in innovation and highest quality demands for our cranes,” says Karl Oberreiter, Head of PALFINGER MARINE.

 

To find out more, please visit the Palfinger Marine website.

Associated companies:


Related news

Latest news

World's fastest ROV? - Project ROST

Traditionally, all cleaning has been carried out from a workboat,

New regional manager takes the helm in key oil and gas markets for DNV GL

Elaborating on the differences in the energy markets which now lie under his new responsibilities in DNV GL,

DNV GL launches certification framework and recommended practice for Carbon Capture and Storage (CCS)

The recommended practice DNVGL-RP-F104 Design and operation of carbon dioxide pipelines, 

DNV GL launches new JDP to test biodegradable lubricants

The test programme will investigate such aspects as hydrodynamic oil film formation,

ROV contracts in Brazil

The new contracts and contract extensions give 1 630 days of ROV services...

Steinsvik Secures a Contract for its First Concrete Barge

Steinsvik’s well-known steel barge design is now complemented by a new and innovative concrete barge design.

Searching for the best biological solutions

AKVA group’s biologists play a key role to ensure that the company’s technology not only meets fish welfare requirements, but also provides the best possible conditions for the fish.

Elisabeth Maråk Støle appointed managing director of Forskningsselskapet SørVest AS

Elisabeth Maråk Støle will take up her position on 1 April 2018 at the latest.

TIME SCALE

We are building chambers for tomatoes to grow in space. The aim is to give food to astronauts going to Mars.