Looking for a specific product?

Make a search for products & suppliers, articles & news.

Our contribution to reducing the LCOE of wind energy

In the wind energy industry there has been major challenges with corrosion,

Oglaend System Group

The past five years we have developed a tremendous number of products to fit in TPs, substations, external platforms, towers and foundations. We take advantage of our well-established knowhow from the oil & gas industry to provide our wind energy customers with solutions that lowers the Levelized Cost of Energy (LCOE).

 

Eliminating maintenance related costs

In the wind energy industry there has been major challenges with corrosion, especially on substations. Entire platforms could be completely red with corrosion before even leaving the yard.

Oglaend System can offer a complete support system in FRP-material, which eliminates any corrosion related maintenance of cable support systems and earthing connections. The FRP system is especially well-suited for substations, where expensive maintenance is not desired.

 

Less retrofitting with kits & cuts

Our companies in Denmark and Netherlands offer kitting and cutting of products for transition pieces (TPs). Our deliveries can be installed straight out of the box, which reduces costly and time-consuming work on-site; as well as preventing retrofitting work.

We have local production for cutting materials to the required lengths, which means that the customers will not have any excess material or material waste to take care of. Minimal cutting and grinding is required on-site, which reduces the risk of harm for the customer.

We also offer “just in time” delivery, which means that our systems and products will be delivered just before the cable support systems are scheduled for installation. That way our products will not be taking up warehouse space over a long period.

All deliveries are packed and labelled with a customer specific article number, which includes all accessories such as bolts and nuts. Picking and packing products is done beforehand, so it is not necessary to organise the parts on-site, instead the products can be installed straight out of the box.

We have already delivered TP kits to several projects such as: Galloper, Beatrice, Rentel, Abeerdeen Bay, Hohe See, Horns Rev 03, Horn Sea 01 and Deutsche Bucht.  

Oglaend System Group

 

Associated companies:


Related news

Latest news

PRESS RELEASE: Servogear to propel Asian built windfarm vessels

The contract with Cheoy Lee Shipyards was signed in Q2 2018.

SERVICEBULLETIN: Grease filling of the propeller system

SERVICEBULLETIN 180921: Grease filling of the propeller system

FILM: The world´s first HD220 gearbox returns for an overhauling

The gearbox has been operating flawlessly for more than 20.000 hours...

Øveraasen delivers machine number 66 to New York

Totally over the last ten years, 

DNV GL commission worlds largest industrial explosion chamber at Spadeadam Research and Testing

The chamber supports not only a joint industry project ...

DNV GL celebrates double win at Lloyd’s List Asia Pacific Awards

We would like to thank all of the judges and Lloyd’s List for these awards,

WITH OR WITHOUT SKIRTINGS?

A theme that often comes back to me while working with new customers is the flooring,

Heating cable segment officially transferred to ØS Varme

Øglænd System AS’s future strategy will be focused on the sale...

Genesis is celebrating its 30th anniversary

TechnipFMC’s market-leading engineering and advisory company,