Looking for a specific product?

Make a search for products & suppliers, articles & news.

Oil&Gas: Gullfaks South to increase output

Statoil and its partner Petoro have decided to further develop Gullfaks South in the North Sea by investing NOK 8.5 billion in two new subsea templates and six extra wells.

This will boost recovery by 65 million barrels of oil equivalent.

In a press release, Statoil says this increasing recovery from Gullfaks South will be implemented as part of of the company's fast-track developments.

"By using the fast-track concept, with standardised solutions and consistent teams in one project, we will improve recovery in an effective manner," says Halfdan Knudsen, vice president for fast-track projects on the Norwegian continental shelf (NCS).

Production in parts of Gullfaks South was shut down in 2008 to maintain an acceptable pressure level in the reservoir for future drilling operations.

Existing wells are being reopened in the course of 2012. And new wells will also be drilled from existing seabed templates on Gullfaks South.

Recovery will be increased further with the fast-track concept and production start-up is planned from 2014.

This will be the second fast-track development to be tied back to Gullfaks for processing and it exploits spare capacity on one of the big producers on the NCS (Visund South was resolved in 2011).

Associated companies:


Related news

Latest news

Vestdavit agrees dive boat cooperation with Hukkelberg

Opportunities in the offshore market are resurfacing after a long dry spell,

PLAR-4000 plays role in NZ seamanship excellence

The relationship between Vestdavit and Australian-headquartered Antelope Engineering extends back to 2000,

To meet the special duties envisaged,

The PL-3600R davit is equipped with shock absorbers,

Olympic Commander keeps Vestdavit alongside for Med rescue mission

To meet the special duties envisaged,

New After Sales Director on-board

Henric will take responsibility for building up strong,

MAINTENANCE CONTRACT WITH STATOIL TJELDBERGODDEN

Beerenberg has entered into a 7-year contract for ISO and other supporting services at Statoil’s Tjeldbergodden facilities. The contract is running from 1 January 2018.

DNV GL: Standardisation can help enable the digital transformation of shipping

DNV GL’s new position paper focuses on the collection of ship sensor data, 

Industry's preferred pipeline standard gets update by DNV GL

A number of requirements related to linepipe fabrication,

Servogear Hybrid CPP for the World’s First Hybrid Catamarans in Commercial Traffic

Norled AS is one of Norway’s largest ferry and express boat operators.