Looking for a specific product?

Make a search for products & suppliers, articles & news.

Oil&Gas: A world's first for Statoil

For the very first time, remote-controlled machines and an underwater welding robot have installed a new tie-in point on a live gas pipeline, without the pipeline being prepared in advance.

These types of operations can save Statoil lots of money in the long run.

The hot tap installation is the first to be carried out in connection with preparations for Åsgard subsea gas compression in the Norwegian Sea, and thus also represents a milestone for the project. The tie-in point was welded on to the Åsgard B production flowline at a water depth of 265 metres.

After ten days on the field, the hot-tap operation team on board the Technip-owned vessel Scandi Arctic could confirm success in the pioneering operation.

"For a subsea engineer, this can be compared with landing on Mars," says Kjell Edvard Apeland. He is project manager of the remote-controlled hot tap development in Statoil and head of the operation on the Åsgard field.

Simply explained, a remote-controlled hot tap operation consists of a robot welding a T-piece on to the pipe, while gas is flowing through it. When that has been done, a remote-controlled drilling machine will drill holes in the producing pipeline, with no effect on pressure and production.

"When the compressor module and the manifold for Åsgard subsea compression are installed next year, we will connect the pipeline from these to the hot-tap tie-in point," says Apeland.

The Åsgard subsea compression project will be realised in 2015, as the first of its kind in the world. Compressors will be installed on the seabed, instead of on a platform. This will improve recovery from the Mikkel and Midgard reservoirs by around 280 million barrels of oil equivalents.

Associated companies:


Related news

Latest news

PRESS RELEASE: Servogear to propel Asian built windfarm vessels

The contract with Cheoy Lee Shipyards was signed in Q2 2018.

SERVICEBULLETIN: Grease filling of the propeller system

SERVICEBULLETIN 180921: Grease filling of the propeller system

FILM: The world´s first HD220 gearbox returns for an overhauling

The gearbox has been operating flawlessly for more than 20.000 hours...

Øveraasen delivers machine number 66 to New York

Totally over the last ten years, 

DNV GL commission worlds largest industrial explosion chamber at Spadeadam Research and Testing

The chamber supports not only a joint industry project ...

DNV GL celebrates double win at Lloyd’s List Asia Pacific Awards

We would like to thank all of the judges and Lloyd’s List for these awards,

WITH OR WITHOUT SKIRTINGS?

A theme that often comes back to me while working with new customers is the flooring,

Heating cable segment officially transferred to ØS Varme

Øglænd System AS’s future strategy will be focused on the sale...

Genesis is celebrating its 30th anniversary

TechnipFMC’s market-leading engineering and advisory company,