Looking for a specific product?

Make a search for products & suppliers, articles & news.

Oglaend System awarded international contracts

(Klepp 11.03.2013) Oglaend System have recently been awarded two large international contracts. The coming LNG facilities Shell Prelude FLNG and Inpex Ichthys CPF will be supplied with multidiscipline supports, cable tray and -ladder from Oglaend System.

 

Both LNG facilities will be built at Samsung Heavy Industries in South-Korea and according to plan these facilities will produce their first gas in 2016 and 2017 - NW offshore Australia.

 - It is very pleasant for me to note that world leading engineering companies and operators as well as the big yards in South-Korea have identified the cost-saving potential in our multidiscipline support systems. I take it as a sign that our international strategy is working, says CEO, Geir Austigard. 


Facts about Shell Prelude FLNG
Prelude 2

Operator: Shell Australia
Engineering: Technip, Paris and Kuala Lumpur
Yard: Samsung Heavy Industries
First gas: 2017
Field: Prelude Concerto Gasfield NW offshore Australia 
First delivery: Q3 or Q4 2013
Quantity: 500.000 metres ladder/tray.
Steel quantity: App.. 2.000 tonnes.
 

 

 

Facts about Inpex Ichthys CPF
Inpex Ichthys CPF

Operator: Inpex
Engineering: Mustang Engineering, Houston
Yard: Samsung Heavy Industries
First gas: 2016
Field: Ichthys Gasfield NW offshore Australia
First delivery: Q3 or Q4 2013

 

Read more at aftenbladet.no 

 


 

Contact information: 

Søren Arentsen

Øglænd Industrier
Mobile: +47 47 61 27 92

 

Associated companies:


Related news

Latest news

DNV GL launches new JDP to test biodegradable lubricants

The test programme will investigate such aspects as hydrodynamic oil film formation,

ROV contracts in Brazil

The new contracts and contract extensions give 1 630 days of ROV services...

Steinsvik Secures a Contract for its First Concrete Barge

Steinsvik’s well-known steel barge design is now complemented by a new and innovative concrete barge design.

Searching for the best biological solutions

AKVA group’s biologists play a key role to ensure that the company’s technology not only meets fish welfare requirements, but also provides the best possible conditions for the fish.

Elisabeth Maråk Støle appointed managing director of Forskningsselskapet SørVest AS

Elisabeth Maråk Støle will take up her position on 1 April 2018 at the latest.

TIME SCALE

We are building chambers for tomatoes to grow in space. The aim is to give food to astronauts going to Mars.

From university to heavy industry: A slow transition

It is nearly winter holiday,

Doria awarded as “best large patrol boat 2017”

Doria is equipped with Servogear Ecoflow Propulsor. 

New CEO in Steinsvik Group

Martha Kold Bakkevig replaces Bjørn M. Apeland as CEO of Steinsvik Group with accession 02.01.2018. Bakkevig has 20 years of experience within management and business development