Looking for a specific product?

Make a search for products & suppliers, articles & news.

Motion Lab gets 8 million NOK

The University of Agder (UiA) in cooperation with Christian Michelsen Research (CMR) has now signed a contract with The Research Council of Norway to upgrade the Motion Laboratory at UiA.

    CMR-Motion-lab
From the opening of Motion Lab with Geir Hovland (UiA, left) and Rune Volla. Photo: The Research Council of Norway

 

Parts of this is given Christian Michelsen Researach (CMR) to establish mobile infrastructure for 3D motion compensation research.

Motion Laboratory

UiA is managing The Motion Laboratory, which has NODE, Norwegian offshore & drilling engineering and Christian Michelsen Research as partners.

The existing equipment established in connection with the NORCOWE program consists of two Stewart platforms (hexapods) from Bosch-Rexroth. The equipment can handle large payloads (up to 8 tonnes) as well as vessel-to-vessel experiments.

 

IMPROVED CAPABILITIES AND BETTER UNDERSTANDING

This new equipment will improve the capabilities of the laboratory and result in a much improved understanding of motion compensation:

•    A high-speed motion capture system with frame rates up to 1000 frames-per-second (fps) covering the entire volume of the Motion Laboratory.
•    A laser tracker with capacity to measure 6 degrees of freedom very accurately (typical translational accuracy of 10-30µm) at a radial distance up to 18m.
•    An outdoor transportable motion platform which allows for testing at research partner sites. This equipment is intended for sensor testing (e.g. LIDARs) onshore or offshore and for testing equipment at research partner sites which is too heavy or too large to transport to the Motion Laboratory.  This platform will be operated by CMR.

Associated companies:


Related news

Latest news

New Machining Center In Fredrikstad

Jotne opened a brand new machining hall in Fredrikstad on the 20th of May.

Construction and Testing of 4 Caterpillar C280 Gensets Finalized

Jotne has together with thier client Pon Power finalized construction and testing of 4 Caterpillar C280 gensets in Jotne’s factory in Fredrikstad. 

DNV GL acquires specialist in CFD for fire and explosion analysis, ComputITG

With its roots in the offshore sector,

New land based contract with Sisomar

Sisomar’s philosophy is close to AKVA group’s underlying strategy to develop technological solutions based on good fish health and solid biology. 

Geothermal energy- an answer for selected areas in Poland

During the last weeks the experts have visited the selected sites in Poland and also been on a study visit to Iceland.

New contract for delivery of Servogear CPP

Servogear announce a new contact for the delivery of Servogear Ecoflow PropulsorTM to a long-range catamaran. The delivery is scheduled to take place in Q2 and Q3 2018.

New contract: Windcat 42 - no 18 in the Servogear series

The delivery of the Servogear Ecoflow Propulsor to Windcat 42 will take place in the first quarter of 2018.

Frank Ketelaars takes the lead for DNV GL - Oil & Gas in the Americas

Frank Ketelaars took up the position of Director of Region Americas in DNV GL – Oil & Gas on 1 October, as North America’s energy system undergoes a transition.

Frank Ketelaars takes the lead for DNV GL - Oil & Gas in the Americas

Frank Ketelaars took up the position of Director of Region Americas in DNV GL – Oil & Gas on 1 October, as North America’s energy system undergoes a transition.