Looking for a specific product?

Make a search for products & suppliers, articles & news.

Great Lakes Energy selects Powel StakeOut Field Design Software

Great Lakes Energy rounds out technology upgrade with Powel’s StakeOut Field Design Software Mobile work management tool complements new GIS

Through its North American subsidiary, Powel, Inc. today announced that Great Lakes Energy of Boyne City, Mich., has selected its StakeOut® mobile field design client to streamline work flow as well as synchronize all office, customer and engineering data for greater access and higher productivity.


Great Lakes Energy is Michigan’s largest electric cooperative, and one of the largest in the country, serving 125,000 members in over 26 counties across the western half of the Lower Peninsula.


Great Lakes system engineer Gus Paz said that installing the client-server based StakeOut 7.5 was part of a substantial technology upgrade that saw them transition from paper to digital after commissioning a Milsoft WindMilMap GIS (Geographic Information System).


“Our plans originally called for acquiring a GIS system and we saw PC-based staking packages as a natural and necessary extension. Until now, all of our field design techniciansmanually sketched drawings and calculated units. Soon they will be designing new job sketches, adding construction units, generating cost estimates and producing staking sheets on a notebook PC. And with built-in interfaces, that same data can populate our digital maps and update our Daffron CIS (Customer Information System).”


StakeOut is the industry-leading field staking software that tracks work through carefully defined processes from initiation to close out, making status updates available throughout the utility. The software integrates with most CIS, Accounting and GIS packages using the NRECA’s MultiSpeak Standard. Work done in the field and posted to a GIS automatically updates the utility’s system maps in near real-time. Personnel throughout the enterprise have access to the most recent information.


The decision to go with StakeOut, according to Paz, was based on a selection criteria developed by Great Lakes when it began evaluating products.


“Obviously, the software had to interface with existing systems, but a primary concern was that it had to be user-friendly. It needed tools to calculate design attributes such as loading and sizing transformers and wires. There also had to be automatic connectivity checks to make sure the system was connected properly. When we compared software packages against these criteria, StakeOut came out on top.”


Even before the cutover to advanced mapping and staking, Paz said that Great Lakes Energy understood the productivity gains and improved customer service that could be achieved simply by the reductions in data entry.


“We won’t have to re-draw maps into the mapping system and both the office and field will be able to share data without a lot of re-entry. Saving all that time will allow us to pay for the StakeOut system in less than three years.”


StakeOut is just one application within the Powel WorkStudio suite. WorkStudio is a mobile work management platform with office-based analysis that helps utilities work smarter through the entire asset lifecycle. Powel WorkStudio contains other complementary applications for vegetation management, storm assessment, maintenance management and timesheets. By implementing applications based on a common platform, utilities can reduce the total deployment cost and risk.

Associated companies:

Related news

Latest news

Chairman Knut Ørbeck-Nilssen sets out transformation of IACS at CMA Shipping 2018

To help the maritime community ensure the cyber-resilience of their assets, 

DNV GL opens LNG test centre to enable safer and more efficient use of LNG

The ability to monitor the composition of LNG in real time 

Peter Brun appointed as DNV GL’s new global offshore wind segment leader

Brun brings more than 26 years of experience 

Getting a solid overview of silicon production at Elkem Thamshavn

Major investment by Bremnes Seashore

The contract comprises two Polarcirkel 1050 Cabin, 

Are you in full control of your equipment?

Poorly maintained nets may harm the fish.

Windcat Workboats builds their 19th and 20th vessel with Servogear CPP

The delivery of the Servogear Ecoflow Propulsor to Windcat 43 and Windcat 44 will take place in Q2 and Q4 2018.   

Steinsvik named “Company of the Year 2017”

Development takes time, and this company is a good example of that.

DNV GL primary project partner in Northern Gas Networks led Hydrogen Network Innovation ProjectNv

The project is split into two phases.