Looking for a specific product?

Make a search for products & suppliers, articles & news.

Photo: CMR

CMR about allocation uncertainty at North Sea Flow Measurement

In times with increased focus on risk minimization and cost-efficiency in the oil and gas sector, it is more important than ever to understand the uncertainty involved in the distribution of produced oil and gas amongst contributing parties, so-called allocation.

Hydrocarbons from different sources are typically mixed during the production of oil and gas. Then the final product is re-distributed to the sources. CMR has a long tradition of working with uncertainty analysis of metering stations and has in the past two years worked on applying their expertise on the analysis of whole allocation systems. As a result of this effort, Senior Scientist Ranveig N. Bjørk presents the paper Analysis of Field and Ownership Allocation Uncertainty in Complex Multi-field Configurations at this year’s edition of the North Sea Flow Measurement Workshop in St. Andrews, UK.

 

ANALYSIS OF ALLOCATION SYSTEMS

“In essence, our work deals with the question of how sure you rally can be that you get the slice of the pie you are entitled to. We illustrate how to analyse complex allocation systems and quantify the risk each field and owner is exposed to. This is an important figure, e.g. when you need to take decisions regarding wether or not to invest in a new metering station”, Bjørk explains.

 

RISK MINIMIZATION

CMR has developed an in-house framework for efficient and accurate modelling of allocation systems, uncertainty calculations and optimization/risk minimization, combining longstanding in-depth domain knowledge of flow metering and state-of-the-art computational methods. The developed approach is fully compliant with the ISO Guide to the expression of uncertainty in measurement (ISO GUM).

Associated companies:


Related news

Latest news

TechnipFMC celebrates 45 years of enhancing the performance of the engineering industry in Spain

TechnipFMC recently commemorated the event with a celebration in Barcelona,

AKVA group to deliver new feed barge to Arctic Sea Farm

Local presence on Iceland and a good training program were critical factors why Arctic Sea Farm hf chose AKVA group as supplier.

World's fastest ROV? - Project ROST

Traditionally, all cleaning has been carried out from a workboat,

New regional manager takes the helm in key oil and gas markets for DNV GL

Elaborating on the differences in the energy markets which now lie under his new responsibilities in DNV GL,

DNV GL launches certification framework and recommended practice for Carbon Capture and Storage (CCS)

The recommended practice DNVGL-RP-F104 Design and operation of carbon dioxide pipelines, 

DNV GL launches new JDP to test biodegradable lubricants

The test programme will investigate such aspects as hydrodynamic oil film formation,

ROV contracts in Brazil

The new contracts and contract extensions give 1 630 days of ROV services...

Steinsvik Secures a Contract for its First Concrete Barge

Steinsvik’s well-known steel barge design is now complemented by a new and innovative concrete barge design.

Searching for the best biological solutions

AKVA group’s biologists play a key role to ensure that the company’s technology not only meets fish welfare requirements, but also provides the best possible conditions for the fish.