Looking for a specific product?

Make a search for products & suppliers, articles & news.

Aker Solutions to equip six drillships in Brazil

Aker Solutions has won a contract to supply drilling equipment packages for a series of six deepwater drillships being built by Jurong Shipyard for the Brazilian market.

The contract includes complete topside and subsea equipment (drilling riser and BOP) packages for six drillships, and an option for one further unit. The value of the contract is undisclosed.

The equipment will be delivered from Aker Solutions in Norway and Germany, as well as from the company's new site in Brazil. Aker Solutions is building a new $100m service and manufacturing facility in Macaé, Brazil's offshore capital, in order to meet the company's growth in the country.

The drilling units will be delivered between 2015 and 2019. The first Aker Solutions equipment will be delivered in the second half of 2013. The contract includes project management, engineering, topside equipment, subsea package including Aker Solutions' Clip riser, and commissioning of the rigs at Jurong's yard in Brazil.

"This contract confirms our strong position in the Brazilian offshore market as well as in the deepwater drilling market. We are grateful for the trust we have been shown by Jurong Shipyard, which we have worked closely with for two years to position ourselves for this opportunity. We look forward to continuing the good, long-term collaboration with the shipyard and the drilling contractors on this project," says Thor Arne Håverstad, head of Aker Solutions' drilling technologies business.

"With the delivery of six complete drilling packages, and a new service and manufacturing site under way in Macaé, Aker Solutions is taking another leap forward in Brazil. Over the last two decades, we have built a strong foundation to meet the growth we see in the market today. With 1 400 employees, we are committed to serve our clients in the Brazilian market," says Luis Antonio Araujo, regional president of Aker Solutions in Brazil.

The 335.000 m2 drilling equipment site in Macaé will be Aker Solutions' fourth facility in Brazil, in addition to sites in Rio das Ostras, Curitiba and Rio de Janeiro.

Associated companies:


Related news

Latest news

The upside down advocate

The hulls of the robust Polarcirkel boats consists of resistant PE plastic,

DNV GL presents GTT and TECHNOLOG with GASA statement for exoskeleton LNG tanks

The solution has been developed for VLCVs with a capacity of 14,000 to 18,000 

DNV GL: Mix of flexibility solutions needed to stabilize power grids and avoid outages

In its recently published Energy Transition Outlook report (ETO),

Marintec China: DNV GL awards DSIC a pair of AiP certificates

Lu Xiao Hui, Vice President and Chief Technical Officer of DSIC,

DNV GL partners with SP Energy Networks to develop local flexibility market and reduce carbon emissions by over 3 megatonnes

The flexibility market will be based on the Universal Smart Energy Framework (USEF),

DNV GL Supports Hawaii Counties in Department of Energy’s Better Communities Alliance

After reviewing the competitive applications, 

DNV GL releases the new issue of MARITIME IMPACT magazine

In this issue of MARITIME IMPACT,

Businesses failing to adapt to climate change despite exposure to extreme weather risks, according to DNV GL report

A new international survey conducted by DNV GL, 

DNV GL at Marintec China: Classification steps up to the digital challenge

IACS was working to adapt regulations to new needs and remove regulatory barriers,