Replies from the industry to Request for Information (RFI) regarding submarine capability beyond 2020 has been received - Norway Exports

Looking for a specific product?

Make a search for products & suppliers, articles & news.

Replies from the industry to Request for Information (RFI) regarding submarine capability beyond 2020 has been received

After 2020 Norway’s six Ula-class submarines will reach the end of their service life. An ongoing study led by the Ministry of Defence (MoD) is producing a basis for the decision between a life extension of the Ula-class, a replacement program, or a combination of the two. The recommendation will be presented in 2014. The chosen solution will then form the basis for a project definition phase before an investment project is presented for the Norwegian Parliament, which is planned to happen within 2017.

The study is proceeding according to plan. The Norwegian Defence Logistics Organisation (NDLO) has just received replies to a “Request for Information” (RFI) issued in September 2012 to a number of prequalified shipyards. These include DCNS (France), Fincantieri (Italy), Navantia (Spain), ThyssenKrupp Marine Systems (representing Kockums AB, Sweden and HDW, Germany) and Daewoo Shipbuilding & Marine Engineering (DSME, South Korea).

The shipyards have answered the RFI by sending answers and required documentation to the NDLO. In February 2013, representatives from the shipyards will come to Norway to present and clarify their responses as necessary. The responses and the documentation will be thoroughly reviewed and analyzed over the course of the next six months. Based on the information received, the MoD will produce a detailed overview of costs, performance, production time and other important aspects related to a potential procurement of new submarines.

The information provided by the industry is just one of several important steps in the process of producing a basis for the decision between a life extension program and new submarines. In addition, the MoD is engaged in discussions with other nations in order to identify if there is any potential for cooperation. Material cooperation with other nations can produce significant cost saving and synergies, and is an integrated part of the process. In the months ahead, life extension of the Ula-class will be studied and analyzed in detail as well. Thereafter, the two main alternatives will be subject to thorough comparison and evaluation before a recommendation can be presented to the government in 2014.

December 20th, 2012

 

Related news

Latest news

Servogear propulsion technology enable sustainable Arctic cruises

We are really happy to have Servogear on board,

Students develop "health check" to prevent cyberattacks

It is very rewarding working with cyber security,

DOF Subsea contract awards

DOF Subsea has been awarded a contract in the Atlantic region...

Invitation to Elkem’s second quarter and half year 2018 results presentation

The company will host a presentation at 8.00 a.m. 

DNV GL checks technical and financial risks of three Norwegian wind farms totaling 294 MW

Working alongside Norwegian developer Norsk Vind...

Sperre AS on National Geographic

Last autumn, National Geographic was on Lake Tinn in Norway...

DNV GL secures Shell Penguins contract

The Penguins field is in 165 metres (541 feet) of water,

DNV GL helps Borealis to realise ambitious energy targets by cutting over 360,000 tons of CO2 annually

Over the course of four years, 

Kickstart your autumn with «The AKVAculture Day”

The event, which takes place in BI’s facilities at Marineholmen in Bergen,